300L Brewery Beer Equipment for Pub/Bar/Hotel/Restaurant

Product Details
Customization: Available
After-sales Service: Yes, on Line Support
Warranty: 5 Years
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Quality Assurance
The supplier provides quality assurance
to see all verified strength labels (30)
  • 300L Brewery Beer Equipment for Pub/Bar/Hotel/Restaurant
Find Similar Products

Basic Info.

Model NO.
MT-300L
Processing Material
Natural Ingredients, Water,Malt,Hops,Yeast
Application
Beer Brewing,Beer Brewery
Customized
Customized
Certification
CE, ISO9001, TUV
Power Source
Electric Steam,Gas or Direct Fire
Automatic Grade
Semi-Automatic
Main Material
SUS304 Stainless Steel
Processing Types
Beer Brewing Equipment
Voltage
220V/380V/Adjustable
Dimension(L*W*H)
Depends on Capacity
Beer Equipment Weight
1000kg-10000kg
Material Thickness
Inner:3.0mm, Exteior:2.0mm
Polish Finish
0.4-0.6um
Brewhouse Heating
Steam Jacket , Electric Tube, Direct Fire
Control Unit
Temp. Controller, HMI, PLC or Touching Screen
Cooling Unit
Chiller with Glycol Tank
Insulation
Polyurethane Foam
Technology
Offer Auto CAD and 3D Design Drawing
After Sales Service
Installation and Equipment Commission
Transport Package
Plastic Film, Plywood Case; Container;
Specification
Customized
Trademark
METO
Origin
Shandong, China
HS Code
84384000
Production Capacity
10 Set/Sets Per Month Stainless Steel Brewhouse

Product Description



300L 500L Brewery Beer Equipment For Pub/Hotel/Restaurant 



 
2 Vessel Brewhouse  3 Vessel Brewhouse 

Mash/Lauter tun+Brew kettle/whirlpool tank

1.Lauter&storage tank+brew kettle/whirlpool tank

2.Lauter&whirlpool tank ,+brew kettle

3.Lauter&HLT +brewkettle/whirlpool tank

Combined 3 Vessel Brewhouse  4 Vessel Brewhouse
1.Mash/lauter tun+ brew kettle +whirlpool tank

2.Mash tun+ lauter tank + brewkettle/whirlpool tank

 Mash tun +lauter tank + brew kettle+whirlpool tank

UNit Components Capacity  Specification 
Milling  Miller  200KG/H Double Roller,Noise<60db
Brewhouse  Mash/Lauter tun 500L Mashing Process:Decoction.Infusion.Multi-step infusion 
   Brew Kettle/Whirlpool Tank  500L Heating source:Steam,Electric,direct fire
SUS304/Red copper
   Hot Water Tank   800L  Heating source:Steam,Electric,Gas
   Heat exchanger  5 SQM  Stainless steel plate
 Fermentation tank   Fermentation Tank  
(The number according to customer requirements)
 500L or 1000L  Top manway/Side manway
Drying hop port to brew IPA
Dimple Plate Cooling jacket
Carbonation port to fill CO2
 Yeast Adding Tank 5-10 L  SUS304 Stainless Steel
 Cooling System    Glycol Water tank  1500L  Equiped with PU level indicator
 Chiller   5Hp  UL/CE certified electric elements,Copeland compressor
Pump 3T/H  
Cleaning System Disinfection Tank 50-100L SUS304 full welded
Alkali Tank 50-100L
Pump 3T/H
Control System  Control Cabinet  PID or PLC  
Optional

Auger System
Grain Case
Grist Hydrator 
Piping flow panel for Brewhouse
Brewhouse Separate PLC Controller 
Steam Boiler Customized 
...



Packaging Details

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.


1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;

2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and locate food, and hotel shall be afforded by the buyer

3. The installation period is about 15 days including assembling brewing tanks and training the operator.  It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.

4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.

5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should be installed separately. If needed, cost calculate additionally.

6. Brewing technology, brewing formula, can be offered available

7. More spare parts are available to offered freely.




Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier