Turnkey Project 1000L stainless steel fermentation micro brewing machine beer brewery equipment for sale
UNit |
Components |
Capacity |
Specification |
Malt Mill |
Miller |
300KG/H |
Double Roller,Noise<60db |
Brewhouse |
Mash/Lauter tun |
1000L |
Mashing Process:Decoction.Infusion.Multi-step infusion |
Brew Kettle/Whirlpool Tank |
1000L |
Heating source:Steam,Electric,direct fire SUS304/Red copper |
Fermentation tank |
Fermentation Tank (The number according to customer requirements) |
1000L or 2000L |
Top manway/Side manway Drying hop port to brew IPA Dimple Plate Cooling jacket Carbonation port to fill CO2 |
Cooling System |
Glycol Water tank |
3000L |
Equiped with PU level indicator |
Cooling machinery |
5P*2 |
UL/CE certified electric elements,Copeland compressor |
Cleaning System |
Disinfection Tank |
100L |
SUS304 full welded |
Alkali Tank |
100L |
Pump |
3T/H |
Control System |
Control Cabinet |
PID or PLC |
|
Optional |
Auger System
Grain Case
Grist Hydrator
Piping flow panel for Brewhouse
Brewhouse Separate PLC Controller
Steam Boiler Customized
...... |
Packaging Details
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.
Our service for you:
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of
your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the
travelling cost and locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the
operator. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other
communication method available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment,
etc. should be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.