Per Batch Beer Brewing Equipment 300L 500L Micro Brewery for Sale

Product Details
Customization: Available
After-sales Service: 5 Years for Tank
Warranty: 3 Years
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
30
Year of Establishment
2021-06-08
  • Per Batch Beer Brewing Equipment 300L 500L Micro Brewery for Sale
Find Similar Products

Basic Info.

Model NO.
MT-300L
Application
Beverage
Customized
Customized
Certification
CE, ISO9001
Power Source
Electric
Automatic Grade
Semi-Automatic
Material
SUS304 Stainless Steel
Cooling System
Dimple Plate Jacket
Control System
PLC/Himi/Touch Screen
Thickness
Inner:3-4mm, Exteior:2mm
Voltage
220V/380V/Adjustable
Capacity
300L
Dimension(L*W*H)
Depending on Capacity
Weight
Depending on Capacity
Welding
Bothe Sides TIG Welding
Transport Package
Plastic Film, Plywood Case; Container;
Specification
User Requirements
Trademark
METO
Origin
Shandong, China
HS Code
84384000
Production Capacity
10 Set/Sets Per Month Stainless Steel Brewhouse

Product Description


Per Batch Beer Brewing Equipment 300L 500L Micro Brewery for Sale

2 Vessel Brewhouse  3 Vessel Brewhouse 

Mash/Lauter tun+Brew kettle/whirlpool tank

1.Lauter&storage tank+brew kettle/whirlpool tank

2.Lauter&whirlpool tank ,+brew kettle

3.Lauter&HLT +brewkettle/whirlpool tank

Combined 3 Vessel Brewhouse  4 Vessel Brewhouse
1.Mash/lauter tun+ brew kettle +whirlpool tank

2.Mash tun+ lauter tank + brewkettle/whirlpool tank

 Mash tun +lauter tank + brew kettle+whirlpool tank
UNit Components Capacity  Specification 
Malt mill  Miller  100KG/H Double Roller,Noise<60db
Brewhouse  Mash/Lauter tun 300L Mashing Process:Decoction.Infusion.Multi-step infusion 
 Brew Kettle/Whirlpool Tank  300L Heating source:Steam,Electric,direct fire
SUS304/Red copper
 Fermentation tank   Fermentation Tank  
(The number according to customer requirements)
 300L or 600L Top manway/Side manway
Drying hop port to brew IPA
Dimple Plate Cooling jacket
Carbonation port to fill CO2
 Cooling System    Glycol Water tank  800L  Equiped with PU level indicator
 Chiller   3p  UL/CE certified electric elements,Copeland compressor
Pump 3T/H  
Cleaning System Disinfection Tank 50-100L SUS304 full welded
Alkali Tank 50-100L
Pump 3T/H
Control System  Control Cabinet  PID or PLC  
Optional

Auger System

Grain Case
Grist Hydrator 
Piping flow panel for Brewhouse
Brewhouse Separate PLC Controller 
Steam Boiler Customized 

...

Packaging Details

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.




1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;

2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and locate food, and hotel shall be afforded by the buyer

3. The installation period is about 15 days including assembling brewing tanks and training the operator.  It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.

4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.

5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. 
should be installed separately. If needed, cost calculate additionally.

6. Brewing technology, brewing formula, can be offered available

7. More spare parts are available to offered freely.




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed