Newest All in One Brewery 100L Beer Brewing System Medium Micro Beer Brewery Equipment

Product Details
Customization: Available
Processing Material: Water Malt Yeast Hops
Application: Beer
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
30
Year of Establishment
2021-06-08
  • Newest All in One Brewery 100L Beer Brewing System Medium Micro Beer Brewery Equipment
Find Similar Products

Basic Info.

Model NO.
MT-2000L
Customized
Customized
Certification
CE, ISO9001
Power Source
Electric
Automatic Grade
Semi-Automatic
Condition
New
Material
Full Stainless Steel SUS304
Welding
Arc Argon Protection
After Sales Service
Installation and Equipment Commission
Technology
Offer Auto CAD and 3D Design Drawing
Material Thickness
Inner Wallet 3mm Outer Wallet 2mm
Electric Elements
up to CE UL Standard
Brewhouse Heating
Steam Jacket,Electric Tube,Direct Fire
Fermenter
Double Wallet with Dimple Cooling Jacket
Cooling Unit
Chiller with Glycol Tank
Control Unit
Temp. Controller ,HMI , PLC or Touching Screen
Guarantee Warranty
3 Years for Tank
Transport Package
Plastic Film, Plywood Case; Container;
Specification
User Requirements
Trademark
METO
Origin
Jinan China
HS Code
84384000
Production Capacity
10 Set/Sets Per Month Stainless Steel Brewhouse

Product Description

 

Product Description

 

100L SUS304  Beer Brewing Equipment For Sale



UNit Components Capacity  Specification 
Milling  Miller  50KG/H Double Roller,Noise<60db
Brewhouse  Mash/Lauter tun 100L Mashing Process:Decoction.Infusion.Multi-step infusion 
   Brew Kettle/Whirlpool Tank  100L Heating source:Steam,Electric,direct fire
SUS304/Red copper
   Hot Water Tank   100L  Heating source:Steam,Electric,Gas
   Heat exchanger 15 SQM  Stainless steel plate
 Fermentation tank   Fermentation Tank 
(The number according to customer requirements)
100L or 200L  Top manway/Side manway
Drying hop port to brew IPA
Dimple Plate Cooling jacket
Carbonation port to fill CO2
 Yeast Adding Tank  10L  SUS304 Stainless Steel
 Cooling System    Glycol Water tank  300L  Equiped with PU level indicator
 Chiller  2Hp  UL/CE certified electric elements,Copeland compressor
Pump 3T/H  
Cleaning System Disinfection Tank 150L SUS304 full welded
Alkali Tank 150L
Pump 1T/H
Control System  Control Cabinet  PID or PLC  
Optional

Auger System

Grain Case
Grist Hydrator 
Piping flow panel for Brewhouse
Brewhouse Separate PLC Controller
Steam Boiler Customized 
......

 

 
Hot Products
Company Profile

Our Advantages

Packaging & Shipping


Packaging Details

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.

 
FAQ

Our service for you:
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of
your brewery;

2. Professional engineers going abroad for the installation ,debugging, and training, all the
travelling cost and locate food, and hotel shall be afforded by the buyer

3. The installation period is about 15 days including assembling brewing tanks and training the
operator. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer
for the extended installation.

4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication
method available to the customer.

5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment,etc. should
be installed separately. If needed, cost calculate additionally. 

6. Brewing technology, brewing formula, can be offered available

7. More spare parts are available to offered freely.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed